Ableach Caserones – Dump leach expansion

More than 20 years of engineering experience

Description

Conceptual engineering to expand the dump leaching system, increasing capacity to 272 Mt and extending the operation’s life. It integrated technical, environmental and operational analysis to maximize copper recovery.