Our Experience
More than 20 years of engineering experience
Concentrator Plants
Detailed engineering for the Fallback The End project – Phase 1
Fluid Transport
Inter-plant pumping system flexibility
Infrastructure
Detailed engineering for a service dock – Guayacán Port
Infrastructure
Aqueduct capacity increase
Fire Protection Systems
GPTA fire protection systems
Tailings Handling and Disposal
Stage 4 spillway – El Mauro
Concentrator PlantsTailings Handling and Disposal
Arqueros Project – Detailed engineering for a concentrator plant
Concentrator Plants
Feasibility engineering to improve environmental conditions
Concentrator Plants
Engineering to recover the design capacity of a concentrator plant
Concentrator Plants
Centinela Project – Jameson cell installation
Fluid Transport
Lomas Bayas concentrate pipeline – water supply alternatives
Fluid Transport
Slack flow control – Minera Esperanza
Leaching and Waste Dumps
Expert support for conventional chloride leaching at DRT
Leaching and Waste Dumps
Ableach Caserones – Dump leach expansion
Leaching and Waste Dumps
Leached ore dump expansion phase IX – Radomiro Tomic Division
Leaching and Waste Dumps
Secondary leaching ore dump expansion phase VIII – Radomiro Tomic Division
Tailings Handling and Disposal
SPS/DPS phase study – Spence Tailings Hydraulic Barrier
Tailings Handling and Disposal
STR overflow capture – Quillayes
Tailings Handling and Disposal
Tailings repulping – Quillayes
Tailings Handling and Disposal
Hydraulic monitors for tailings repulping
Tailings Handling and Disposal
Basic tailings repulping – Quillayes
Tailings Handling and Disposal
Filtered tailings storage facility No. 3 – Potrerillos
Tailings Handling and Disposal
Tailings removal – Pérez Caldera dam
Infrastructure
66 kV line optimization – Los Bronces
Infrastructure
Los Bronces reservoir relocation
Infrastructure
Rock breaker replacement – Escondida
Infrastructure
Hydraulic Barrier – Spence
Infrastructure
SPRR4 – Groundwater remediation
Infrastructure
Desalination plant drainage improvements
Infrastructure
ACO–SIQ aqueduct master program
Infrastructure
Mooring platform replacement at Punta Chungo port
Infrastructure
Complementary detailed engineering – Integrated STMG Project
Fire Protection Systems
Primary crusher fire protection – Chuquicamata