Centinela Project – Jameson cell installation
More than 20 years of engineering experience
Description
Detailed engineering for the installation of a Jameson flotation cell, including the dismantling of existing equipment and the installation of new mechanical, electrical and instrumentation systems. It included upgrades to ensure operational continuity, as well as on-site support for installation and testing, ensuring efficient integration with the existing plant.