Leached ore dump expansion phase IX – Radomiro Tomic Division
More than 20 years of engineering experience
Description
Detailed engineering for the construction of modules 5 and 6, the collection system and the water table monitoring system of the Phase IX leached ore dump. The service included review and validation of previous engineering, site visits, multidisciplinary coordination and preparation of construction documents and drawings, ensuring technical consistency, constructability and compliance with standards for project execution.