Mooring platform replacement at Punta Chungo port

More than 20 years of engineering experience

Description

Feasibility engineering to replace four platforms on the port’s mooring dolphins, including remediation, dismantling and installation of new steel structures with safe access systems. The project incorporated structural design, marine logistics and permit management, with a focus on operational safety and HSEC risk reduction. It ensured the continuity of shipping operations and improved personnel access conditions in a demanding marine environment.