Secondary leaching ore dump expansion phase VIII – Radomiro Tomic Division
More than 20 years of engineering experience
Description
Detailed engineering for the expansion of the Phase VIII leached ore dump, aimed at ensuring the operational continuity of the secondary leaching process. The scope included the design of stacking platforms and integrated lining, drainage, solution collection and irrigation systems, together with the associated civil, electrical and instrumentation works. Construction solutions were optimized and existing facilities integrated, ensuring operational efficiency and compliance with safety and environmental standards.