SPS/DPS phase study – Spence Tailings Hydraulic Barrier
More than 20 years of engineering experience
Description
SPS/DPS engineering to optimize a hydraulic barrier designed to mitigate seepage from a tailings dam. The project included the design of extraction and monitoring wells, validation of previous engineering, development of integrated design bases and cost estimates, together with the execution plan and operating strategies to ensure the system’s continuity and environmental control.