Stage 4 spillway – El Mauro
More than 20 years of engineering experience
Description
Detailed engineering for a flood spillway system at a tailings dam. It included comprehensive hydraulic design for flow intake, conveyance and dissipation, ensuring operation during extreme events and regulatory compliance.